Specific Tasks


 We worked on the majority of the project together, as we did with all the previous labs.  The hardware actually always took both of us because it involved constantly required creativity and brainstorming.  The overall design of the software was completed together and large chunks of the more difficult parts were written together.  A few times, after a segment of the code had been discussed and only needed implementing, we divided the work and coded our individual parts separately. 

@

A large part of building the circuitry and hardware and coding was done at our off-campus site, Prachifs apartment, and so we came to the on-campus lab only to test our project.  Testing was done by both of us whenever we were available to be in lab.  We did actually manage to go in together most of the time and arranged our schedules so that this could be done often.  The write-up and website design was completed by both of us.  Each section was assigned to one person to write and design.  We were a great team!