>>>>>>>>>inherited 80C196KB <<<<<<<<
  • Labs from FALL 1997
    1. Introduction to the hardware and software.
    2. Reaction time tester.
    3. One-octave keyboard.
    4. Serially controlled, 8-channel DVM.
    5. Capacitance measurement.
    6. Digital/analog mixer/delayline.
    7. Motor position controller.
    8. Design project.

    >>>>>>>>> Start AVR <<<<<<<<<<<<<
  • Labs from SPRING 1999
    1. Introduction to the hardware and software.
    2. Reaction time tester.
    3. One Octave Synthesizer.
    4. Serially controlled, digital capacitance meter (DCM).
    5. Add a keyboard and display to the DCM.
    6. Choice:
    • Digital Voltmeter
    • Calculator
    7. Design project
     
  • Labs from SPRING 2000
    1. Introduction to the hardware and software. (week of Jan 31)
    2. Reaction time tester. (week of Feb 7)
    3. Cricket call generator (weeks of Feb 14 and Feb 21)
    4. Serially controlled, sinewave generator. (weeks of Feb 28 and Mar 6)
    5. Add a keyboard and display to lab 4. (weeks of Mar 13 and Mar 27)
    6. Digital Voltmeter (weeks of April 3 and April 10)
    7. Design project (weeks of April 17, 24 and May 1).
  • Labs from SPRING 2001
    1. Introduction to the hardware and software. (week of Jan 28)
    2. Reaction time tester in ASM. (week of Feb 4)
    3. Cricket call generator in C (weeks of Feb 11 and Feb 18)
    4. Security system in C. (week of Feb 25)
    5. Sinewave generator with keypad and LCD display in C and ASM. (weeks of Mar 4and Mar 11)
    6. Digital thermometer and fan (weeks of March 25 and April 1)
    7. Design project (weeks of April 8, 15, 22 and 29).
  • Labs from SPRING 2002
    1. Introduction to the hardware and software. (week of Jan 27)
    2. Reaction time tester. (week of Feb 3)
    3. Cricket call generator. (week of Feb 11)
    4. Security system. (weeks of Feb 18 and Feb 25)
    5. Sinewave generator with keypad and LCD display in C and ASM. (weeks of Mar 4and Mar 11)
    6. Digital thermometer and fan (weeks of March 25 and April 1)
    7. Design project (weeks of April 8, 15, 22 and 29).
  • Labs from SPRING 2003
    1. Introduction to the hardware and software. (week of Feb 3)
    2. Reaction time tester. (week of Feb 10)
    3. Television control and video clock. (week of Feb 17)
    4. Serial control of TV graphics. (weeks of Feb 24 and Feb Mar 3)
    5. Oscilloscope etch-a-sketch (weeks of Mar 10 and Mar 24)
    6. Digital thermometer and fan (deleted?)
    7. Design project (weeks of March 31, April 7, 14, 21 and 28).
  • Labs from SPRING 2004
    1. Reaction time tester. (week of Feb 9)
    2. Sinewave synthesis(week of Feb 16)
    3. Security system(week of Feb 23 and Mar 1)
    4. TV oscilloscope. (weeks of Mar 8 and Mar 15)
    5. Digital thermometer and fan (Mar 29)
    6. Design project (weeks of April 5, 12, 19 and 26 and May 3).
  • Labs from SPRING 2005
    1. Reaction time tester. (week of Feb 7)
    2. Cricket call synthesizer (week of Feb 14 and 21)
    3. Security system (week of Feb 28)
    4. Video game with analog control (weeks of Mar 7 and Mar 14)
    5. Digital thermometer and fan (week of Mar 28)
    6. Design project (weeks of April 4, 11, 18 and 25 and May 2).
  • Labs from SPRING 2006
    0.Introduction to the hardware and software (week of Jan 30)
    1.Stop Watch (week of Feb 6)
    2. DTMF dialer with voice feedback (weeks of Feb 13,20)
    3. Security system (week of Feb 27)
    4. Video game with analog control (weeks of Mar 6,13)
    5. Digital thermometer and fan (week of Mar27)
    6. Design project (weeks of April 3,10,17,24 and May 1).
  • Labs from SPRING 2007
    0. Introduction to the hardware and software (week of Jan 29)
    1. Reaction time measurement (week of Feb 5)
    2. Cricket call synthesizer (weeks of Feb 12,19)
    3. Security system (week of Feb 26)
    4. Digital oscilloscope (weeks of Mar 5,12)
    5. Talking digital thermometer and fan controller (week of Mar 26)
    6. Design project (weeks of April 2, 9, 16, 23, 30).
  • Labs from SPRING 2008
    • 0. Introduction to the hardware and software (week of Jan 28)
    • 1. Capacitance measurement (week of Feb 4)
    • 2. DTMF dialer with voice feedback (weeks of Feb 11,18)
    • 3. Security system (week of Feb 25)
    • 4. Video Game (weeks of Mar 3, 10)
    • 5. Digital thermometer and fan controller (week of Mar 24)
    • 6. Design project (weeks of March 31, April 7, 14, 21, 28).
  • Labs from spring 2009
    • 0. Introduction to the hardware and software (week of Jan 26)
    • 1. Capacitance measurement (week of Feb 2)
    • 2. DTMF dialer (weeks of Feb 9, 16)
    • 3. Security system (week of Feb 23)
    • 4. Video Game (weeks of Mar 2, 9)
    • 5. Digital thermostat and motor controller (week of Mar 23)
    • 6. Design project (weeks of March 30, April 6, 13, 20, 27).
  • Labs Spring 2010
    • 1. Capacitance measurement (week of Feb 1, 8)
    • 2. Cricket call generator (weeks of Feb 15, 22)
    • 3. Video Game (weeks of Mar 1, 8)
    • 4. Tachometer and motor controller (week of Mar 15, 29)
    • 5. Design project (weeks of April 5, 12, 19, 26, May 3).
  • Labs Spring 2011
    • 1. Capacitance measurement (weeks of Jan 31, Feb 7)
    • 2. DTMF dialer (weeks of Feb 14, 21)
    • 3. Video Game (weeks of Feb 28, Mar 7)
    • 4. Tachometer and motor controller (week of Mar 14, 28)
    • 5. Design project (weeks of April 4, 11, 18, 25, Demo week of May 2).
  • Labs Spring 2012
    • 1. Reaction time measurement (weeks of Jan 30, Feb 6)
    • 2. Digital multimeter (weeks of Feb 13, 20)
    • 3. Audio sequencer and synthesizer (weeks of Feb 27, Mar 5)
    • 4. Tachometer and motor controller (week of Mar 12, 26)
    • 5. Design project (weeks of April 2, 9, 16, 23, Demo week of April 30).
  • Labs Fall 2012
    • 1. Capacitance meter (weeks of August 27, Sept 3)
    • 2. Cricket call generator (weeks of Sept 10, 17)
    • 3. Digital Oscilloscope (weeks of Sept 24, October 1)
    • 4. Tachometer and motor controller (weeks of October 10, 17)
    • 5. Design project (weeks of October 22, 29, November 5, 12, Demo week of November 26).

    Labs Fall 2013

    • 1. Capacitance meter (weeks of Sept 2, Sept 9)
    • 2. DTMF dialer (weeks of Sept 16, 23)
    • 3. Infrared remote key and lock (weeks of Sept 30, October 7)
    • 4. Motor controller and tachometer (weeks of October 14, 21)
    • 5. Design project (weeks of October 28, November 4, 11, 18 Demo week of DEC 2).

     

    Labs Fall 2014

    • 1. Capacitance meter (weeks of Sept 8, Sept 15)
    • 2. Cricket Call Generator (weeks of Sept 22, 29)
    • 3. Video Game (weeks of Oct 6, October 13)
    • 4. Motor controller and tachometer (weeks of October 20, 27)
    • 5. Design project (weeks of November 3, 10, 17, 24 Demo week of DEC 1).

    >>>>>>>>> End AVR <<<<<<<<<<<<<


    >>>>>>>>> Start PIC32 <<<<<<<<<<<

    Labs Fall 2015

    • 1. Capacitance meter (weeks of Sept 1, Sept 7)
    • 2. DTMF dialer (weeks of Sept 14, 21)
    • 3. TFT video game (weeks of Sept 28, Oct 5, October 12)
    • 4. Motor controller and tachometer (weeks of October 19, 26)
    • 5. Design project (weeks of November 2, 9, 16, 23 Demo week of DEC 1).

    Fall 2016

    • 1. Capacitance meter
    • 2. DTMF dialer
    • 3. TFT-LCD video game
    • 4. Motor controller and tachometer
    • 5. Design project

    Fall 2017

    • 1. Construct board and Capacitance meter (weeks of Aug 21, 28, Sept 4)
    • 2. Cricket call generator (weeks of Sept 11, 18)
    • 3. TFT-LCD video game (weeks of Sept 25, Oct 2, 9)
    • 4. 1 DOF helicopter controller (weeks of October 16, 23)
    • 5. Design project (weeks of Oct 30, Nov 6, 13, 20, Demo week of NOV 27).