>>>>>>>>>inherited 80C196KB <<<<<<<<
- Labs from FALL 1997
- 1. Introduction to the hardware and software.
- 2. Reaction time tester.
- 3. One-octave keyboard.
- 4. Serially controlled, 8-channel DVM.
- 5. Capacitance measurement.
- 6. Digital/analog mixer/delayline.
- 7. Motor position controller.
- 8. Design project.
>>>>>>>>> Start AVR <<<<<<<<<<<<<
- Labs from SPRING 1999
- 1. Introduction to the hardware and
software.
- 2. Reaction time tester.
- 3. One Octave Synthesizer.
- 4. Serially controlled, digital capacitance
meter (DCM).
- 5. Add a keyboard and display to the
DCM.
- 6. Choice:
- Digital Voltmeter
- Calculator
- 7. Design project
-
- Labs from SPRING 2000
- 1. Introduction to the hardware and
software. (week of Jan 31)
- 2. Reaction time tester. (week of Feb
7)
- 3. Cricket call generator (weeks of
Feb 14 and Feb 21)
- 4. Serially controlled, sinewave generator.
(weeks of Feb 28 and Mar 6)
- 5. Add a keyboard and display to lab
4. (weeks of Mar 13 and Mar 27)
- 6. Digital Voltmeter (weeks of April
3 and April 10)
- 7. Design project (weeks of April 17,
24 and May 1).
- Labs from SPRING 2001
- 1. Introduction to the hardware and software.
(week of Jan 28)
- 2. Reaction time tester in ASM. (week
of Feb 4)
- 3. Cricket call generator in C (weeks
of Feb 11 and Feb 18)
- 4. Security system in C. (week of Feb
25)
- 5. Sinewave generator with keypad and
LCD display in C and ASM. (weeks of Mar 4and Mar 11)
- 6. Digital thermometer and fan (weeks
of March 25 and April 1)
- 7. Design project (weeks of April 8,
15, 22 and 29).
- Labs from SPRING 2002
- 1. Introduction to the hardware and software.
(week of Jan 27)
- 2. Reaction time tester. (week of Feb
3)
- 3. Cricket call generator. (week of
Feb 11)
- 4. Security system. (weeks of Feb 18
and Feb 25)
- 5. Sinewave generator with keypad and
LCD display in C and ASM. (weeks of Mar 4and Mar 11)
- 6. Digital thermometer and fan (weeks
of March 25 and April 1)
- 7. Design project (weeks of April 8,
15, 22 and 29).
- Labs from SPRING 2003
- 1. Introduction to the hardware and software.
(week of Feb 3)
- 2. Reaction time tester. (week of Feb
10)
- 3. Television control and video clock.
(week of Feb 17)
- 4. Serial control of TV graphics. (weeks
of Feb 24 and Feb Mar 3)
- 5. Oscilloscope etch-a-sketch (weeks
of Mar 10 and Mar 24)
- 6. Digital thermometer and fan (deleted?)
- 7. Design project (weeks of March 31,
April 7, 14, 21 and 28).
- Labs from SPRING 2004
- 1. Reaction time tester. (week of Feb 9)
- 2. Sinewave synthesis(week of Feb 16)
- 3. Security system(week of Feb 23 and
Mar 1)
- 4. TV oscilloscope. (weeks of Mar 8 and
Mar 15)
- 5. Digital thermometer and fan (Mar 29)
- 6. Design project (weeks of April 5, 12,
19 and 26 and May 3).
- Labs from SPRING 2005
- 1. Reaction time tester. (week of Feb 7)
- 2. Cricket call synthesizer (week of Feb 14 and 21)
- 3. Security system (week of Feb 28)
- 4. Video game with analog control (weeks of Mar 7 and Mar 14)
- 5. Digital thermometer and fan (week of Mar 28)
- 6. Design project (weeks of April 4, 11, 18 and 25 and May 2).
- Labs from SPRING 2006
- 0.Introduction to the hardware and software (week of Jan 30)
- 1.Stop Watch (week of Feb 6)
- 2. DTMF dialer with voice feedback (weeks of Feb 13,20)
- 3. Security system (week of Feb 27)
- 4. Video game with analog control (weeks of Mar 6,13)
- 5. Digital thermometer and fan (week of Mar27)
- 6. Design project (weeks of April 3,10,17,24 and May 1).
- Labs from SPRING 2007
- 0. Introduction to the hardware and software
(week of Jan 29)
- 1. Reaction time measurement (week of Feb
5)
- 2. Cricket call synthesizer (weeks of
Feb 12,19)
- 3. Security system (week of Feb 26)
- 4. Digital oscilloscope (weeks
of Mar 5,12)
- 5. Talking digital thermometer and fan controller (week
of Mar 26)
- 6. Design project (weeks of April 2, 9, 16, 23, 30).
- Labs from SPRING 2008
- 0. Introduction to the hardware and software (week of Jan 28)
- 1. Capacitance measurement (week of Feb 4)
- 2. DTMF dialer with voice feedback (weeks of Feb 11,18)
- 3. Security system (week of Feb 25)
- 4. Video Game (weeks of Mar 3, 10)
- 5. Digital thermometer and fan controller (week of Mar 24)
- 6. Design project (weeks of March 31, April 7, 14, 21, 28).
- Labs from spring 2009
- 0. Introduction to the hardware and software (week of Jan 26)
- 1. Capacitance measurement (week of Feb 2)
- 2. DTMF dialer (weeks of Feb 9, 16)
- 3. Security system (week of Feb 23)
- 4. Video Game (weeks of Mar 2, 9)
- 5. Digital thermostat and motor controller (week of Mar 23)
- 6. Design project (weeks of March 30, April 6, 13, 20, 27).
- Labs Spring 2010
- 1. Capacitance measurement (week of Feb 1, 8)
- 2. Cricket call generator (weeks of Feb 15, 22)
- 3. Video Game (weeks of Mar 1, 8)
- 4. Tachometer and motor controller (week of Mar 15, 29)
- 5. Design project (weeks of April 5, 12, 19, 26, May 3).
- Labs Spring 2011
- 1. Capacitance measurement (weeks of Jan 31, Feb 7)
- 2. DTMF dialer (weeks of Feb 14, 21)
- 3. Video Game (weeks of Feb 28, Mar 7)
- 4. Tachometer and motor controller (week of Mar 14, 28)
- 5. Design project (weeks of April 4, 11, 18, 25, Demo week of May 2).
- Labs Spring 2012
- 1. Reaction time measurement (weeks of Jan 30, Feb 6)
- 2. Digital multimeter (weeks of Feb 13, 20)
- 3. Audio sequencer and synthesizer (weeks of Feb 27, Mar 5)
- 4. Tachometer and motor controller (week of Mar 12, 26)
- 5. Design project (weeks of April 2, 9, 16, 23, Demo week of April 30).
- Labs Fall 2012
- 1. Capacitance meter (weeks of August 27, Sept 3)
- 2. Cricket call generator (weeks of Sept 10, 17)
- 3. Digital Oscilloscope (weeks of Sept 24, October 1)
- 4. Tachometer and motor controller (weeks of October 10, 17)
- 5. Design project (weeks of October 22, 29, November 5, 12, Demo week of November 26).
Labs Fall 2013
- 1. Capacitance meter (weeks of Sept 2, Sept 9)
- 2. DTMF dialer (weeks of Sept 16, 23)
- 3. Infrared remote key and lock (weeks of Sept 30, October 7)
- 4. Motor controller and tachometer (weeks of October 14, 21)
- 5. Design project (weeks of October 28, November 4, 11, 18 Demo week of DEC 2).
Labs Fall 2014
- 1. Capacitance meter (weeks of Sept 8, Sept 15)
- 2. Cricket Call Generator (weeks of Sept 22, 29)
- 3. Video Game (weeks of Oct 6, October 13)
- 4. Motor controller and tachometer (weeks of October 20, 27)
- 5. Design project (weeks of November 3, 10, 17, 24 Demo week of DEC 1).
>>>>>>>>> End AVR <<<<<<<<<<<<<
>>>>>>>>> Start PIC32 <<<<<<<<<<<
Labs Fall 2015
- 1. Capacitance meter (weeks of Sept 1, Sept 7)
- 2. DTMF dialer (weeks of Sept 14, 21)
- 3. TFT video game (weeks of Sept 28, Oct 5, October 12)
- 4. Motor controller and tachometer (weeks of October 19, 26)
- 5. Design project (weeks of November 2, 9, 16, 23 Demo week of DEC 1).
Fall 2016
- 1. Capacitance meter
- 2. DTMF dialer
- 3. TFT-LCD video game
- 4. Motor controller and tachometer
- 5. Design project
Fall 2017
- 1. Construct board and Capacitance meter (weeks of Aug 21, 28, Sept 4)
- 2. Cricket call generator (weeks of Sept 11, 18)
- 3. TFT-LCD video game (weeks of Sept 25, Oct 2, 9)
- 4. 1 DOF helicopter controller (weeks of October 16, 23)
- 5. Design project (weeks of Oct 30, Nov 6, 13, 20, Demo week of NOV 27).